A 3.57 MW Solar Power Plant is being developed as a hybrid production in existing Kale Regulator and HEPP Project, which has an installed capacity of 30 MW, located within the borders of Amasya province.
Kale Hybrid Solar Power Plant
Project Status
Under Development
Kurulu Güç
3,57 MW
Estimated Date
2024
Yıllık Üretim
4,64 GWh
Location
Amasya