The project situated on the Çapans Stream received provisional acceptance in December 2013 and was subsequently commissioned. Featuring two vertical Pelton turbines with individual capacities of 18.46 MWm, the project boasts a total installed capacity of 36.92 MWm. Leveraging a project flow rate of 9 m³/sec and a gross head of 480 m, the project's annual generation capacity amounts to 84 GWh.
Özlüce Weir and HEPP
Project Status
Operational
Kurulu Güç
36,92 MW
Year
2012-2014
Yıllık Üretim
84,00 GWh
Location
Erzurum